Wiki

Clinic: Difference between revisions

From 2D Tower Wiki
This page was last edited on 7 September 2026, at 09:17.
Gary (talk | contribs)
Add Rooms navigation navbox
Gary (talk | contribs)
Sync rooms from Godot content
Line 5: Line 5:
|Construction cost=$300,000
|Construction cost=$300,000
|Maintenance cost=$1,000/day
|Maintenance cost=$1,000/day
|Workers=2–10
|Workers=2
|Power=5
|Power=5
|Size=22 tiles × 1 floor
|Size=22 tiles × 1 floor
|Category=[[:Category:Facilities|Facilities]]
|Category=[[:Category:Facilities|Facilities]]
}}
}}
Clinic is a room available in 2D Tower. A medical clinic
 
Clinic is a buildable item in 2D Tower. A medical clinic
== Overview ==
== Overview ==
* Construction cost: $300,000
* Construction cost: $300,000
* Maintenance: $1,000 per day
* Maintenance: $1,000 per day
* Staffing: 2–10
* Staffing: 2
* Active power use: 5
* Active power use: 5
* Footprint: 22 tiles × 1 floor
* Footprint: 22 tiles × 1 floor

Revision as of 09:17, 7 September 2026

Clinic
Clinic
A medical clinic



Construction cost$300,000
Maintenance cost$1,000/day
Workers2
Power5 
Size22 tiles × 1 floor
CategoryFacilities


Clinic is a buildable item in 2D Tower. A medical clinic

Overview

  • Construction cost: $300,000
  • Maintenance: $1,000 per day
  • Staffing: 2
  • Active power use: 5
  • Footprint: 22 tiles × 1 floor
  • Category: Facilities